Laying up for winter
November · log #41
Mast down, sails washed in fresh water and dried for two days before folding. The engine got its last run with antifreeze through the raw-water side. Next job: a cover frame from electrical conduit, cheaper than the timber one I built last year and far lighter.
Re-bedding the stanchion bases
October · log #40
Two of the port stanchions had been weeping into the cabin since spring. Removed, cleaned back to bare gelcoat, countersunk the holes and re-bedded with butyl tape. Dry after the first proper storm.
Three days down the coast
September · log #39
Light northerlies the whole way, which meant a lot of motoring on day one and a lovely reach home on day three.
| Leg | Distance | Engine |
| Home → north anchorage | 14 nm | 3.5 h |
| North anchorage → town quay | 9 nm | 1 h |
| Town quay → home | 19 nm | 0.5 h |
The cheapest useful upgrade
August · log #38
A second reef line led back to the cockpit. Forty metres of 8 mm line, two blocks and an afternoon. Reefing early is now something I actually do.